Skip to Content
Voice and data

Cabling that holds up for the next ten years

Cable is the cheapest part of the installation and the most expensive to change. You do it right once or you do it three times.

Book a 15-min call See all services
Génesis Online
Press Enter to send · You're talking to Génesis, not a form

The cost of leaving it as it is

These are the consequences we see most often when this isn't addressed in time.

Every badly done drop gets paid for by cutting into the wall again

Intermittent outages eat up your people's hours chasing a ghost

Without drawings, the next technician starts from scratch again

What's included

The scope is set in writing before we start. No surprises at billing time.

  • Cable run design based on floor plans and expected growth
  • Category 6 or 6A depending on the service life you need
  • Conduit, labeling and rack organization
  • Certification of every drop with calibrated equipment
  • As-built drawings, not just the design

How we do it

Four steps, in this order, with an assigned owner from start to finish.

01

We visit the site and survey distances, conduits and obstacles

02

We propose the cable run with the number of drops and category

03

We install, label and organize the rack

04

We certify drop by drop and deliver the results

Who it's for

New offices or remodels

Companies that grew by adding cables without a plan

Those who are moving and want to arrive with the network ready

Let's start by looking at what you already have

We visit your site, survey what's there today and give you in writing what's worth changing, in what order and with what budget. The survey is quoted as consulting and is deducted from the project if you hire us.

Schedule the visit