Skip to Content
Infrastructure

Systems that end up actually working

Buying the equipment is the easy part. The installation is done when your people know how to use it and you have in writing what was installed.

Book a 15-min call See all services
Génesis Online
Press Enter to send · You're talking to Génesis, not a form

The cost of leaving it as it is

These are the consequences we see most often when this isn't addressed in time.

Purchased equipment stays in the box because nobody configured it

Without acceptance testing, problems show up after you've paid

Without training, your people use ten percent of what you bought

What's included

The scope is set in writing before we start. No surprises at billing time.

  • Complete system installation and configuration
  • Integration with what you already have running
  • Acceptance testing before sign-off
  • Training for the staff who will operate it
  • Documentation of the final configuration

How we do it

Four steps, in this order, with an assigned owner from start to finish.

01

We define the scope in writing before we start

02

We install and configure according to that scope

03

We test with you present and fix whatever comes up

04

We train and deliver the documentation

Who it's for

Projects left half-done by another provider

Companies that bought equipment nobody configured

New installations that require several technologies working together

Let's start by looking at what you already have

We visit your site, survey what's there today and give you in writing what's worth changing, in what order and with what budget. The survey is quoted as consulting and is deducted from the project if you hire us.

Schedule the visit