Skip to Content
Fiber optics

Fiber installed to last

Fiber doesn't forgive mistreatment. A badly made bend radius or a dirty splice gets paid for in losses that show up months later.

Book a 15-min call See all services
Génesis Online
Press Enter to send · You're talking to Génesis, not a form

The cost of leaving it as it is

These are the consequences we see most often when this isn't addressed in time.

A badly made bend radius shows up months later as loss

The link fails when it rains and nobody knows which section

Repairing without drawings means opening up the entire route

What's included

The scope is set in writing before we start. No surprises at billing time.

  • Indoor and outdoor runs with the protection each section requires
  • Conduit, hardware and slack reserves
  • Termination in trays and distribution frame organization
  • Loss measurement on every installed section
  • Route drawings and labeling

How we do it

Four steps, in this order, with an assigned owner from start to finish.

01

We walk the route and define the type of fiber and protection

02

We run the cable respecting bend radii and slack

03

We terminate, measure and document every strand

04

We deliver drawings, measurements and labeling

Who it's for

Links between buildings or between distant floors

Companies that need more bandwidth than copper can deliver

Projects with distances network cable can't cover

Let's start by looking at what you already have

We visit your site, survey what's there today and give you in writing what's worth changing, in what order and with what budget. The survey is quoted as consulting and is deducted from the project if you hire us.

Schedule the visit